Choosing a new home in Langford can feel like you’re picking between three different journeys: spec, pre-sale, or custom. You want the right mix of timing, design control, and budget certainty without surprises along the way. In this guide, you’ll learn how each path works in the West Shore, what to expect for timelines, finishes, warranties, deposits, and how to choose the best fit for your goals. Let’s dive in.
New-build options in Langford
Langford and nearby Bear Mountain are among the fastest-growing parts of Greater Victoria’s West Shore. You’ll find single-family homes in new subdivisions, custom builds in golf course and gated enclaves, townhomes, and low to mid-rise condos. Local market factors like limited land, rising construction costs, and municipal servicing timelines can affect pricing and possession dates.
If you’re deciding between spec, pre-sale, or custom, start with your move-in schedule, desired design control, and tolerance for construction timelines.
Spec homes: what to expect
Timelines and move-in
Spec homes are move-in ready or near completion. If finished, you can take possession quickly. If the builder is wrapping up, expect weeks to a few months for occupancy. This route suits you if you need quick possession or prefer to see exactly what you’re buying.
Cost and design control
Pricing reflects market conditions at the time of sale. There may be limited room to negotiate if demand is strong. Design changes are minimal since finishes are already selected, though minor touchups or agreed repairs can be addressed before closing.
Warranty and risk
Spec homes are covered by BC’s mandatory new-home warranty once you complete and move in. You can arrange a pre-occupancy inspection to identify deficiencies and confirm a repair plan with the builder.
Pre-sale purchases: how it works
Timelines and deposits
With a pre-sale, you enter a contract before construction is complete, sometimes before it starts. Typical timelines are 12 to 36 months for condos and townhomes, and roughly 9 to 24 months for single-family projects. Deposits are commonly held in trust by the vendor’s lawyer or in a developer trust account with defined refund and release conditions.
Finish selections and upgrades
You usually choose from a design center within a set window. Expect a base package for standard finishes and clear upgrade tiers at extra cost. Deadlines matter. If you miss selection windows, the builder may default to standard choices or substitute comparable materials.
Risks and protections
Pre-sales come with potential construction delays and changes in market value between contract and completion. Mandatory new-home warranty coverage starts at completion, not at contract signing. Confirm how deposits are protected, what happens if the developer faces insolvency, and whether assignment is permitted and at what fee.
Custom builds: full control
Design and approvals
Custom builds give you the greatest control over layout and finishes. Plan for 3 to 9 months for design and approvals, which can extend if your lot is complex or requires variances. Construction commonly takes 8 to 18 or more months. Overall, 12 to 36 plus months from concept to move-in is typical.
Cost, control, and covenants
Custom homes often carry the highest per-square-foot cost due to bespoke design, professional fees, and site-specific work. Establish clear allowances for finishes and a written change-order process to manage budget. In areas like Bear Mountain, community covenants and design guidelines may regulate exterior styles, materials, rooflines, and landscaping.
Warranty and inspections
Most new homes built for sale require mandatory warranty insurance in BC. For owner-occupied custom builds, licensing and warranty rules can differ, so verify your builder’s status and warranty coverage. Arrange staged inspections at key milestones such as foundation, pre-drywall, and final walkthrough.
Local permits and timelines
The City of Langford oversees development and building permits, servicing requirements, and inspections. Smaller single-family or infill projects may move through permitting in weeks to a few months. Larger multi-unit projects need development permits, servicing agreements, and subdivisions that can add months. Seasonal weather, particularly winter rains, can slow site servicing and exterior construction.
Warranties: 2-5-10 coverage
BC’s standard new-home warranty structure is commonly summarized as 2-5-10:
- 2 years on labor and materials, including electrical, plumbing, heating, ventilation, and finishes.
- 5 years on the building envelope, such as exterior cladding, windows, doors, and protection against water penetration.
- 10 years on major structural defects.
Verify the warranty provider, coverage dates, and how to submit claims. Keep a record of all walkthrough notes, repair requests, and communications.
Inspections and walkthroughs
Plan a pre-occupancy inspection for spec and pre-sale homes to catch deficiencies before closing. For custom builds, schedule inspections at key stages in addition to the final walkthrough. Compile a clear deficiency list and confirm timelines for completion and warranty follow-up in writing.
Deposits, contracts, and taxes
Pre-sale deposits are generally held in trust with specific protection terms. Confirm how your deposit is safeguarded, maximum insured amounts, and refund conditions. For spec homes, your deposit or down payment follows a standard trust process within the purchase contract.
Goods and Services Tax of 5 percent applies to most new residential homes in Canada. You may be eligible for partial rebates depending on price and occupancy plans. For financing, pre-sales typically use standard purchase mortgages with deposit structures and possible holdbacks, while custom homes often require construction mortgages with draw schedules.
Due diligence checklist
Use these questions to validate the builder, the product, and the contract terms.
- Project and schedule
- What phase is the project in, and what is the estimated occupancy date?
- What are the remedies for delays, and who handles site servicing and off-site works?
- Pricing and contractual terms
- What is included in the base price? Request a full inclusions list.
- What upgrades are available and at what price? Can you get a written allowance schedule?
- How much is the deposit, how is it held, and what are the refund conditions?
- Are contracts fixed-price or cost-plus? How are change orders priced and approved?
- Builder and developer credentials
- What is the legal company name and address? Are you licensed by BC Housing?
- Can you provide references from recent projects and proof of warranty insurance?
- Permits, approvals, and title
- Is there an occupancy permit or a clear path to one?
- For strata: request the strata plan, bylaws, pro forma budget, and any available minutes.
- Are there restrictive covenants, easements, or rights of way on title?
- Quality control and trades
- Who are the main subcontractors, and what quality checks are used during construction?
- Warranty and post-closing
- Who is the warranty insurer, and what is the claims process?
- Are there any additional builder warranties beyond statutory coverage?
- Finance and taxes
- Does the price include GST, and are you eligible for any rebates?
- For pre-sales, are assignments allowed and what fees apply?
Decision framework
Step 1: Define constraints
- Time to move: immediate for spec, months to years for pre-sale or custom.
- Customization: minimal for spec, moderate for pre-sale, extensive for custom.
- Budget flexibility: potential early pricing with pre-sale, premium for custom.
- Risk tolerance: comfort with delays, market shifts, and developer solvency.
Step 2: Map fit to product
- Need fast occupancy and want to see the home before buying: choose spec.
- Can wait for delivery and want input on finishes: consider pre-sale.
- Require a unique plan or high-end specification: go custom.
Step 3: Complete due diligence
- Verify licensing and warranty insurance.
- Review the contract with a real estate lawyer.
- Gather references and inspect previous builds.
- Budget 5 to 15 percent for contingencies, holding costs, and upgrades.
Step 4: Engage local pros early
- A real estate advisor experienced in Langford new builds and pre-sales.
- A real estate lawyer for contracts and deposits.
- A home inspector with new-construction expertise.
- For custom: an architect or designer, engineer, estimator, and a builder with local track record.
Negotiation tips
- Spec homes
- Ask for recent comparable sales to support pricing discussions.
- Negotiate a clear deficiency schedule and timelines in the contract.
- Pre-sales
- Request a written upgrades list with locked pricing and selection deadlines.
- Seek explicit remedies if completion is significantly delayed.
- Custom builds
- Aim for a fixed-price contract or a detailed cost-plus structure with caps.
- Tie milestone payments to inspections and verified progress.
Next steps in Langford
Whether you want a move-in-ready spec home, a pre-sale with curated finishes, or a one-of-a-kind custom build, the right plan can help you avoid delays and protect your budget. If you would like local guidance on active projects, builder comparisons, and contract reviews, reach out to Amanda Young for a personalized consult.
FAQs
What is the difference between spec, pre-sale, and custom in Langford?
- Spec is move-in ready or near-finished, pre-sale is purchased before completion with some finish choices, and custom is a fully tailored design built to your specifications.
How long does a pre-sale condo or townhome take to complete?
- Many West Shore projects range from about 12 to 36 months from contract to occupancy depending on scale and financing.
What does the 2-5-10 new-home warranty cover in BC?
- It covers 2 years for labor and materials, 5 years for building envelope, and 10 years for major structural defects starting at occupancy.
Do I need a home inspection on a new build?
- Yes. Schedule a pre-occupancy inspection for spec and pre-sales and staged inspections for custom builds to document deficiencies and set repair timelines.
How are pre-sale deposits protected?
- Deposits are typically held in trust and may have protection under the new-home warranty program. Confirm how funds are held, insured limits, and refund terms in your contract.
Does GST apply to new homes in Langford?
- GST of 5 percent applies to most new residential housing in Canada, and some buyers may be eligible for partial rebates based on price and occupancy.
Can I assign a pre-sale contract before completion?
- Often yes, but it depends on your contract. Check if assignments are permitted, any fees, and the required approval process.
What local factors can delay a custom build?
- Design approvals, municipal permitting, site servicing, community covenants, and seasonal weather like winter rains can all affect schedules.